Clean Panel×蒲田工業 - メーカー・企業と製品の一覧

Clean Panelの製品一覧

1~1 件を表示 / 全 1 件

表示件数

[Case Study] Cleaned the beverage filling line in a short period.

No problem if there's not enough height! Examples of using existing ceilings and walls as structural materials for booths.

A new beverage filling process will be established within the existing factory. Initially, it was considered to enclose the filling machine in a booth for cleanliness, but there was not enough height in the factory ceiling, and space for air conditioning units and FFUs could not be secured, which was a concern. Therefore, part of the existing ceiling wall material was coated with dust paint to create clean panels, which were then incorporated into the booth structure. Additionally, clean panels with partition specifications were added to shut out dust intrusion by forming a booth structure. We proposed a construction method that would complete the work, including painting, within three weeks. The project was completed two months after the initial meeting, allowing us to meet the operational start date for the line. [Issues] - The ceiling height at the planned location for the filling machine is 3,000mm, with gypsum board. - The height of the filling machine is 2,800mm. - There is not much time left until the planned start date for operations. *For more details, please refer to the PDF document or feel free to contact us.

  • Other construction services

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録